Enter it in gaj or square feet and we will show you what can be built on it before asking for anything else.
history
Welcome back — we restored your last plan.
info
Two minutes, three steps.You get your build timeline, material quantities, a stage-wise payment plan and a check against Jaipur's plot rules. We quote the price after seeing your site — this page never guesses at it.
Start with the number you already know. Everything else on this page is worked out from it.
×ft
—
Sq. Feet
—
Sq. Yards
—
Gaj
—
Cents
Roughly: a lane is 6m, a colony road 9m, a sector road 12m or wider.
—
Sq. Feet
—
Sq. Yards
—
Gaj
—
Cents
homeGround Coverage:—
Optional — Sharpen Your Plan
Not sure? Leave it on Normal — our team confirms ground conditions during the site visit.
Rooms on a single floor. We add 18% for walls, passages and the staircase.
bedBedroomsबेडरूम150 sqft each3
bathtubBathroomsबाथरूम45 sqft each2
weekendLiving / Hallलिविंग / हॉल220 sqft each1
kitchenKitchenरसोई100 sqft each1
restaurantDining Roomडाइनिंग रूम120 sqft each1
self_improvementPooja Roomपूजा घर40 sqft each1
menu_bookStudy / Officeस्टडी / ऑफिस100 sqft each0
door_frontServant Roomसर्वेंट रूम90 sqft each0
balconyBalconiesबालकनी60 sqft each2
Estimated Per Floor
— sqft
Floors
— sqft/floor
Per Floor
—
Total Built-Up
Approximate — actual built-up area will vary with site conditions, design and material choices.
Floors & Parking
Each additional floor adds about 4 months to the construction timeline.
Selected
G+1
G+1 (2 Floors)
2 Floors Total~12 months est.No parking
Number of Floors
Covered Car Parking
One bay is about 200 sqft.
Basement / Stilt Floor(Optional)
Either, both, or neither — planned separately from the floors above.
Choose Your Package
How much of the work is ours. Each one is a published rate per sq.ft of total built-up area.
Anuda Construction
Architecture · Construction · Interiors · Vaastu
Construction Plan
Generated on —
F 37-38, Govindam Tower, Kardhani,Govindpura Kalwar Road, Jaipur, Rajasthan India - 302012+91 7447158001info@anudaconstruction.com
closeColumn-wall (quoted separately)कॉलम-वॉल (अलग से कोट किया गया)
closeFurniture & loose appliancesफर्नीचर व लूज़ उपकरण
closeMajor external developmentप्रमुख बाहरी विकास कार्य
explore
Vaastu Quick Tips
General guidance only — not a substitute for a full Vaastu consultation with your architect.
door_frontMain Entranceमुख्य द्वार: North or East-facing entrances are considered most auspicious.
stairsStaircaseसीढ़ियां: Best placed in the South or West, rising in a clockwise direction.
water_dropOverhead Water Tankओवरहेड टंकी: Ideally positioned in the South-West corner of the roof.
fenceBoundary Wall Heightबाउंड्री वॉल ऊंचाई: Kept lowest in the North-East and highest in the South-West.
Indicative Floor Plan Concept
A proportional space-planning concept from your room selection on Step 1 — not a working drawing. Walls, doors and the exact layout are finalised with your architect in the Design & Drawings phase.
2 · Plot & Building Rules
An indicative check of your plan against Jaipur's residential planning norms — ground coverage, FAR, setbacks and height for your plot's size band.
crop_free
Add your plot area to see this check
Every planning rule below is keyed to plot size, so we need the plot area from Step 1 — the road width in front of the plot sharpens it further.
Your Plan Against The Norms
—
Setback Sketch
Your plot drawn to scale, with the required setbacks shaded and the buildable footprint inside them.
All Plot Size Bands
gavelGuidance, not an approval.These are indicative residential norms. Actual limits depend on your zone, scheme, road classification and the sanctioned layout, and only JDA / Nagar Nigam / UIT can confirm them for your plot. Always verify with your architect before finalising a design.
3 · Approvals & Documents
Before You Begin
Sort these out before construction starts — several are prerequisites for the sanctioned building plan itself.
description
Land Title & Ownership Documentsभूमि स्वामित्व दस्तावेज़
Registered sale deed, mutation (khatauni) and khasra records confirming clear title before construction begins.
landscape
Land Use / Conversion Certificateभूमि उपयोग / रूपांतरण प्रमाणपत्र
Needed if the plot was originally agricultural — confirms it is converted for residential use.
architecture
Sanctioned Building Plan (Naksha)स्वीकृत भवन नक्शा
Approved map from JDA / Nagar Nigam / UIT as applicable to your zone — required before construction begins.
Issued after construction, confirming the build matches the sanctioned plan — needed for utility connections and resale.
water_drop
Water & Sewer Connectionपानी व सीवर कनेक्शन
Applied for with the local body once the structure is ready for occupancy.
receipt_long
Property Tax Registrationसंपत्ति कर पंजीकरण
Register the new construction for municipal property tax after handover.
warningExact requirements vary by local body (JDA / Nagar Nigam / UIT), zone and plot specifics. This is a general checklist, not legal advice — confirm your plot's exact requirements with our team or the local authority.
4 · Construction Timeline
Estimated Construction Timeline
—
—
We'll flag any weather-sensitive phases that may fall in Jaipur's monsoon window (Jul-Sep).
Key Milestones
Phase-By-Phase Schedule
infoPhases overlap on a live site — the headline timeline is shorter than the sum of the individual durations below.
5 · Labour On Site
Labour On Site
How many people this build needs, by trade and by month. Useful whether you are hiring a contractor or planning to run the site yourself.
Workers On Site, Month By Month
By Trade
infoIndicative man-day thumb rules for a standard residential RCC build. Actual crew sizes depend on your drawings, site access, how much work is sub-contracted and how many trades your contractor runs in parallel.
6 · Payment Plan & Cash Flow
How a build of this size typically bills out — what share falls due at each stage, and how the spend spreads across the months. Use it to check you are never paying ahead of work completed.
savings
Stage-Wise Payment Schedule
Each instalment falls due on completion of the stage above it, never before. The cumulative column is what you will have paid by that point.
Month-By-Month Cash Flow
The same stages spread across the construction months, so you can see which months are heaviest and plan your funding around them.
account_balance_wallet
Combined Monthly Outgo
Your construction instalment above, plus bank interest on the loan amount disbursed so far — what actually leaves your account each month while building.
account_balanceAdd a loan amount in the Loan / EMI tab to see bank interest added to this chart.
Construction instalmentPre-EMI loan interest
—
Heaviest Month
—
Interest During Build
—
Full EMI After Handover
handshakeBefore you sign anything:Insist the payment schedule in your contract is tied to completed stages, not to calendar dates. Keep a retention of around 5% until handover and snag-clearing are done.
infoIndicative stage weightings for a build of this type. Your actual schedule is agreed in the contract and can differ, particularly where material supply is in your scope rather than the contractor's.
7 · Compare Floor Options
Pick a floor count, parking and optionally a basement/stilt for each side — using the same built-up area — so you can isolate exactly what changes if you add a floor now versus later.
Option A
directions_car
Option B
directions_car
Material Impact
Approximate extra structural materials the bigger option needs, using the same thumb-rules as the Materials tab.
engineeringBuilding For The Future?A stronger foundation and columns designed for the taller option now can save you from a costly retrofit if you add a floor later. Ask our design team about future-ready structural planning.
lightbulbQuick GuidanceStarting with a lower floor count keeps your budget and timeline lean — you can always add a floor later if the structure is designed for it. Go straight for a higher option only if you need the space now, for a larger family or rental income.
All Floor Options At A Glance
8 · Material Estimate
Approximate Material Quantities
Each item shows roughly when to have it on site, a practical purchase unit, and a wastage allowance sized to that material.
Room-Based Materials
Sized from the bedroom/bathroom/kitchen counts on Step 1, not from total area.
Site Essentials To Budget For
Easy to forget when budgeting — not quantified above since they depend on site logistics, not built-up area.
water_drop
Water Storage Tankपानी की टंकी
Sintex/RCC tank sized to household use plus site consumption during construction.
construction
Scaffolding & Centeringशटरिंग व सेंटरिंग
Usually rented for the RCC phase, not purchased — budget it as rental, not material cost.
bolt
Temporary Electricity & Water Connectionअस्थायी बिजली व पानी कनेक्शन
Site power for tools/lighting and water for mixing — arrange before excavation starts.
schedule
Curing Water Accessक्योरिंग हेतु पानी
Concrete needs 14-21 days of regular curing water after every pour.
pest_control
Anti-Termite Treatmentदीमक रोधी उपचार
Pre-construction soil treatment plus a post-construction top-up — protects timber fittings and skirting long-term.
What Each Package Covers
Exactly what sits inside each contract, as published on our pricing page. Your current selection is highlighted; change it on Step 2.
warningApproximate quantities only. Actual quantities depend on structural design, soil conditions, drawings and specifications — this is not an engineering-certified bill of quantities.
9 · Loan / EMI Snapshot
A standalone planning tool — enter any loan amount you're considering; this isn't tied to your plan above.
Monthly EMI
₹0
₹0
Principal
₹0
Total Interest
₹0
Total Payable
PrincipalInterest
info
Your Next Three Steps
None of these need us. Do them in this order and you will not lose a month later.
1
fact_checkConfirm your plot papers
Patta or lease deed, and whether your colony is JDA-approved or in a khatedari scheme. This decides everything about the sanction.
2
scienceGet a soil test
A basic bore test costs little and settles the foundation design. It is the cheapest way to avoid the most expensive surprise.
3
architectureGet your drawings started
Sanction drawings take weeks at the local body. Starting them early is what keeps the timeline on this page realistic.
This calculator provides an indicative construction plan — timeline and material quantities only. Actual duration and quantities may vary based on architectural drawings, structural design, site conditions, material specifications and actual project requirements. For exact pricing, share your details below for a site-specific quotation.
Frequently Asked Questions
Do I need government approval before starting construction?expand_more
Yes — a sanctioned building plan from JDA/Nagar Nigam (as applicable to your zone) is required before construction begins. See the "Approvals & Documents" tab above for the full checklist — our team can guide you through map approval as part of the project.
Is this plan Vaastu-compliant?expand_more
This calculator only sizes timeline and materials — see "Vaastu Quick Tips" on the Plan Overview tab for general guidance based on your room selection. Final layout and placement are handled during the design & drawings phase, where we can incorporate your preferences.
Is the structure earthquake-resistant?expand_more
Jaipur falls in Seismic Zone II (moderate risk). A standard RCC-framed structure, designed and detailed correctly, meets code requirements for this zone.
Will monsoon season delay my construction?expand_more
Jaipur's monsoon (roughly July-September) can slow excavation and any exterior work like plastering and painting, so timing your start date matters. Share your preferred start month when you enquire — or book a site visit below — and our project team will sequence the phase schedule to keep monsoon-sensitive work outside the peak rain window wherever possible.
How accurate are the material quantities shown here?expand_more
These are structural thumb-rule estimates, not a certified bill of quantities. Actual requirements depend on your structural design, soil conditions and final drawings — always confirm exact quantities with your engineer before bulk ordering.
What is not included in this plan?expand_more
Land cost, government/approval charges, column-wall work, furniture & loose appliances, and major external development — see "Not Included In This Plan" on the Plan Overview tab.
Want Your Exact Package Pricing?
Share your details and our team will get back to you with a personalised quotation.